Fire Risk Assessments in 30 Minutes, Not 4 Hours
Generate PAS 79-compliant draft reports with action plan, risk matrix, and executive summary — from structured observations to professional document in minutes.
No credit card required. Generate your first report in 30 minutes.
Without InspectReport
- 4+ hours writing each FRA from scratch
- Inconsistent report structure across assessors
- Action plans manually assembled, often incomplete
- Risk matrices calculated by hand — prone to errors
- Copy-paste from old reports — compliance drift
With InspectReport AI
- 30-minute draft with full PAS 79 structure
- Consistent, standards-compliant output every time
- Auto-generated action plan sorted by severity
- Risk matrix computed from your observations
- Always current — built on latest legislation
How It Works
From site visit to delivered report in three steps
OBSERVE
Select from 64 pre-built observations across 11 fire safety sections. Add premises details and photos.
GENERATE
AI drafts your full PAS 79 report — executive summary, findings by section, risk matrix, and prioritised action plan.
DELIVER
Review, edit any section, then export as DOCX or PDF. Sign off and deliver to your client.
See What You Get
A real preview of the AI-generated FRA report output
1.Executive Summary
A fire risk assessment has been carried out at Riverside Office Building, 45 Thames Street, London SE1 in accordance with PAS 79-1:2020. The premises comprise a 3-storey traditional brick construction office building with approximately 80 regular occupants.
The assessment identified 5 action items including 1 critical and 2 high-priority deficiencies. The overall fire risk is assessed as Moderate. Immediate action is required to address the locked final exit and absence of a fire alarm system.
8.Assessment of Risk
| Likelihood \ Consequence | Slight Harm | Moderate Harm | Extreme Harm |
|---|---|---|---|
| Low | Trivial | Tolerable | Moderate |
| Medium | Tolerable | Moderate | Substantial |
| High | Moderate | Substantial | Intolerable |
9.Action Plan
| # | Priority | Deficiency | Recommended Action | Ref |
|---|---|---|---|---|
| 1 | Critical | Final exit from rear kitchen locked with key | Fit appropriate emergency exit hardware. Ensure exit openable without a key at all times when premises occupied. | Art. 14, RRFSO 2005 |
| 2 | High | No fire detection / alarm system installed | Install fire detection and alarm system to BS 5839-1 appropriate to building type and occupancy. | BS 5839-1:2017 |
| 3 | High | Fire doors propped open on first floor corridor | Remove door props. Consider automatic hold-open devices linked to fire alarm. | — |
| 4 | Medium | Fixed wiring inspection overdue (>5 years) | Commission EICR from qualified electrician within 3 months. | BS 7671:2018 |
| 5 | Medium | No appointed fire wardens | Appoint sufficient fire wardens for all occupied areas. Provide appropriate training. | — |
6.5.Fire Detection and Alarm
At the time of this assessment, no fire detection and alarm system was installed within the premises. There are no manual call points at exit positions and no automatic smoke or heat detectors provided.
Given the size and occupancy of the building (3 floors, approximately 80 occupants), a fire detection and alarm system to at least Category L2 of BS 5839-1:2017 is considered necessary. Installation should include manual call points at all exit positions and automatic detection in escape routes, plant rooms, and areas of high fire risk.
This is a sample preview. Generate your own FRA in minutes.
Questions Assessors Ask
Built by fire safety professionals, for fire safety professionals
Trusted by fire safety professionals across the UK
Enterprise-grade compliance and security built in from day one
Built on Current Legislation
- RRFSO 2005Regulatory Reform (Fire Safety) Order 2005
- FSA 2021Fire Safety Act 2021
- BSA 2022Building Safety Act 2022
- FS(E)R 2022Fire Safety (England) Regulations 2022
- PAS 79-1PAS 79-1:2020 Fire risk assessment — Part 1: Code of practice
- BS 5839-1BS 5839-1:2017 Fire detection and fire alarm systems
- BS 5266-1BS 5266-1:2016 Emergency lighting
- BS 5306-8BS 5306-8:2012 Selection, installation and maintenance of portable fire extinguishers
Responsible AI
- AI generates drafts only — every report requires professional review and sign-off
- Your inspection data is not used for AI training
- Full edit history tracked for audit compliance
- Outputs clearly marked as AI-assisted drafts
Trusted by Fire Safety Professionals
Hear from assessors who've transformed their workflow with InspectReport AI
“InspectReport AI has cut our report drafting time by 70%. What used to take 4 hours now takes 30 minutes. The PAS 79-1 compliance structure is spot on, and the action plan generation is incredibly accurate.”
James Whitfield
Senior Fire Risk Assessor, Meridian Safety Consultants
“We've processed over 200 reports with InspectReport AI. The building intelligence feature tracks risk trends across our entire portfolio, and the team collaboration tools keep our 12 assessors coordinated.”
Sarah Mitchell
Head of Compliance, CityGuard Fire Safety
“As a sole practitioner, this tool is a game-changer. Photo analysis catches observations I might miss, and the voice recording feature lets me dictate notes while on site. My clients love the professional output.”
David Chen
Independent Fire Assessor, Chen Safety Services
“InspectReport AI has cut our report drafting time by 70%. What used to take 4 hours now takes 30 minutes. The PAS 79-1 compliance structure is spot on, and the action plan generation is incredibly accurate.”
James Whitfield
Senior Fire Risk Assessor, Meridian Safety Consultants
The Compliance Trinity
Three assessments. One platform. Cover the most common UK building compliance requirements — pay per report, no monthly fees.
Fire Risk Assessment
PAS 79-1:2020 · England & Wales
64
observations
11
sections
11
legislation
PAS 79-1:2020 compliant fire risk assessment drafts with structured observations, risk matrix, and prioritised action plans.
Learn moreAsbestos Management Survey
HSG264:2012 · England & Wales
42
observations
8
sections
8
legislation
HSG264-compliant asbestos management surveys with material assessment, priority scoring, and management plans.
View PricingLegionella Risk Assessment
BS 8580-1:2019 · England & Wales
54
observations
8
sections
10
legislation
L8 ACoP / BS 8580-1 compliant legionella risk assessments with schematic mapping and control measures.
View PricingCompliance Trinity Bundle
Start with 3 free reports — then pay per report from £15/report
Start with Fire Risk Assessment today — add the Trinity bundle when Asbestos & Legionella verticals launch.
View PricingMore Verticals Coming Q2 2026
Same engine, same quality — new inspection types
Asbestos Management Survey
HSG264:2012 · England & Wales
HSG264-compliant asbestos management surveys with material assessment, priority scoring, and management plans.
Learn moreLegionella Risk Assessment
BS 8580-1:2019 · England & Wales
L8 ACoP / BS 8580-1 compliant legionella risk assessments with schematic mapping and control measures.
Learn moreBundle all three verticals: from £15/report · View pricing
Get notified when new verticals launch:
Write your next FRA in 30 minutes.
Join assessors who draft PAS 79-1 compliant fire risk assessments in a fraction of the time. Start with 3 free reports.
3 free reports included. No credit card required. Pay per report — no monthly fees.
Get fire safety updates in your inbox
Important Disclaimer
InspectReport AI generates draft reports that must be reviewed, verified, and signed by a competent professional before they can be considered valid statutory documents. AI-generated content is provided as a productivity tool, not a replacement for professional judgement.